I am planning to have 5 Scenes.
Today is the 19th of July and I have completed 1 scene. I am currently workingon my 2nd scene.
But...is it due in August?? or October??? i'm confused!
In class, i encountered a problem (see post below) but managed to solve it. I have the JPEG file thing, and with that, i'll start zoomed in the black part and then zoom out. Then, i'll show different parts of the charger line. If what I just wrote was incomprehendable,,, I'll upload the video when i'm done!
Tuesday, July 19, 2011
Problem encountered...and solution:)

As shown in the first few seconds of scene 1,
I used my iphone 4 in a orange case. This was done in Term 2.
During the holidays, i got a new case, totally forgot about the animation thingy i was doing and chucked out the orange case.
So, using photoshop, I created a picture I could use instead of my actual iphone in a orange case sitting on a desk connected to the laptop by a charger.
So, using photoshop, I created a picture I could use instead of my actual iphone in a orange case sitting on a desk connected to the laptop by a charger.
(The charger is important cuz thats how the little doodle jump dude came out of the laptop)
Wednesday, July 13, 2011
Tuesday, June 28, 2011
Completed Scene 1
Scene 1 of Oodle Jump has been completed by the end of term 2! Whoop!!
Below this post is my storyboard. I have made a minor change:
Box number - Scene number
Before
1 - 1
2 - 2
3 - 2
After
1 - 1
2 - 1
3 - 1
So basically, Scene 1 is longer and scene 2 doesn’t exist anymore; meaning that scene 3 is 2, 4 is 3, 5 is 4, etc.
I’ll upload Scene 1 on the next post because I didn’t bring my USB
It’s the holidays! I’m in another country! .........and, im updating my creative media blog..........How sad :’(
Below this post is my storyboard. I have made a minor change:
Box number - Scene number
Before
1 - 1
2 - 2
3 - 2
After
1 - 1
2 - 1
3 - 1
So basically, Scene 1 is longer and scene 2 doesn’t exist anymore; meaning that scene 3 is 2, 4 is 3, 5 is 4, etc.
I’ll upload Scene 1 on the next post because I didn’t bring my USB
It’s the holidays! I’m in another country! .........and, im updating my creative media blog..........How sad :’(
Monday, May 23, 2011
Monday, May 9, 2011
#2 Stop Motion: USB
This is my 2nd stop motion that i made last lesson with the separate camera connected to the laptop. I think the camera is really useful when doing the istopmotion thing - it's easier to see whats going on, on the screen when your not worried about bumping it...
USB:
USB:
Sunday, May 8, 2011
Stop Motion -> Sand Motion
Apparantly, we only have one week to work on iStopmotion.
so, me and camille went down to the sand pit thingy at Junior School and made this random thing
Our plan was to build up the sand and crush it down into a castle -- if that makes any sense;;
but, our time was limited and the last minute change was made:
It's in 2 parts because the original one didnt upload for a whole lesson
Incase you dont get whats happening:
1. the sand is building up
2. the sand dump thing is crashing down
3. (was suppose to crash down into a castle but) decided to get this random bucket to thump down onto the sand from the sky
4. the bucket gets pushed down
5. when i go pick up the bucket, there is no more sand in the bucket.
(Yes. thats moi. like my shoes? :)
so, me and camille went down to the sand pit thingy at Junior School and made this random thing
Our plan was to build up the sand and crush it down into a castle -- if that makes any sense;;
but, our time was limited and the last minute change was made:
It's in 2 parts because the original one didnt upload for a whole lesson
Incase you dont get whats happening:
1. the sand is building up
2. the sand dump thing is crashing down
3. (was suppose to crash down into a castle but) decided to get this random bucket to thump down onto the sand from the sky
4. the bucket gets pushed down
5. when i go pick up the bucket, there is no more sand in the bucket.
(Yes. thats moi. like my shoes? :)
Subscribe to:
Posts (Atom)






